A raised floor is constructed with a wooden framework that bridges from one exterior wall to another.
Framing wall to concrete floor.
Walls are built from the ground up.
This framework may or may not be supported intermediately by girders beams or walls.
Use a hammer drill with 3 16 masonry bit to drill a hole through the wood and into the concrete floor.
Stand the wood frame wall up on the concrete foundation in the spot where it will be anchored.
Other nails have a thick shank that sometimes has spiral ridges for improved holding power.
With the baseplate secure to the concrete floor i ve got a good base to attach my wall frame to.
I use tapcon concrete screws to secure the wood to the floor.
Use an impact driver to drive a 3 tapcon screw through the wood and into the floor.
Step 2 insert a masonry bit that is 5 8 inch in diameter and at least 12 inches long into a hammer drill.
Measure from the floor to the ceiling in at least three spots in the wall location.
Subtract 3 1 4 inches to find the stud length needed.
Choose a length that will penetrate the concrete at least 1 inch.
When you have a window on the concrete wall you will have to build a frame around the window.
In this video i show you my technique for installing a bottom plate of wall to concrete floor for finishing a basement or garage.
Repeat at the other end of the board.
Use these time stamps to ju.
If you have a drain line or other plumbing line make sure to run the line between the joists and where it comes down vertically bring it between studs in on a wall.
While you can hire a pro contractor to do this it is easy to do it on your own as well.
That way i can build the frame on the ground and then lift it into place.
Some concrete nails are the cut nail design shown in the photo with a thick flat shank and a tapering v profile.
And the vertical studs can t go all the way from the floor to joist.
In this section i ve cleared out some space on my garage floor.
This allows for the thickness of both plates actually 1.
Be sure to wear safety goggles when hammering masonry nails into concrete.
Process first you should clean the area where the wall framing will be installed by cleaning sweeping and vacuuming as necessary.
Attaching your wall framing to the concrete floor is a necessary part of the process after building a brand new framed wall.
On upper levels of a house the underside of the floor framing generally serves to back ceiling materials.